The problem
Most cities and counties set stormwater requirements for new development and redevelopment above a size threshold: limits on peak runoff, water-quality treatment, and sometimes infiltration or reuse.
Meeting them means calculating runoff before and after development and designing controls — detention or retention ponds, underground storage, bioretention, permeable pavement or proprietary treatment units.
Stormwater facilities often need a long-term maintenance agreement recorded with the property, so owners should understand the ongoing obligations before choosing a design.
When you need a licensed Professional Engineer
- Stormwater management plans and drainage reports submitted for development approval are normally prepared and sealed by a licensed civil engineer.
- Projects in floodplains or that alter streams may need additional floodplain or water-quality permits.
Engineers can only seal work in states where they are licensed. Check a PE license by state →
Typical scope of work
- Identify the local and state stormwater requirements that apply.
- Pre- and post-development runoff calculations (hydrology).
- Design of detention, retention or water-quality controls and the storm drain system.
- Stormwater management report and plan sheets.
- Operation and maintenance plan for the facilities.
What you get
- Sealed stormwater management plan and calculations report
- Storm drain and facility design drawings
- Operation and maintenance plan
- Responses to review comments
Before you post: what to have ready
- Site address and size, and existing and proposed impervious areas
- Survey and site plan
- Soil information or geotechnical report, if available
- Local development review comments
- Your preferences on above-ground versus underground facilities
What affects the cost
Fees vary by location, scope and urgency, so the reliable way to price your project is to compare quotes. These are the main factors engineers price on:
- Site size and how much impervious area is added
- Local requirements (quantity only, or quality and volume too)
- Type of facility and whether infiltration testing is needed
- Floodplain or stream involvement
- Review rounds with the reviewing agency
How it works
- Post the project with the site plan and location.
- Civil engineers quote the analysis and design.
- The engineer models runoff and designs the controls.
- The plan and report go to the city or county for approval.
Frequently asked questions
Does a small project need stormwater management?
It depends on local thresholds, which are often based on new impervious area or disturbed area. Some small projects only need simple measures such as downspout disconnection; others need engineered facilities.
What is the difference between detention and retention?
Detention stores water temporarily and releases it slowly; retention holds water permanently or until it soaks in or evaporates. Local rules and soils determine which works.
Do I need a geotechnical report?
Often, if the design relies on infiltration. Soil testing shows how fast water soaks in and whether infiltration is feasible.