Hire an engineer

Erosion Control and EPSC Plans

Before ground is disturbed, most sites need a plan that keeps soil on site and out of streets, storm drains and streams. Depending on where you are, it is called an erosion control plan, an EPSC (erosion prevention and sediment control) plan or part of a SWPPP.

The problem

Construction sites that disturb one acre or more — or are part of a larger common plan of development — generally need coverage under the stormwater construction permit program, which is run by the state environmental agency in most states. That coverage requires a Stormwater Pollution Prevention Plan (SWPPP).

Smaller sites are often still regulated by city or county erosion control ordinances. Tennessee, for example, uses EPSC plans, and many local governments require one with any grading permit.

A typical plan covers the order of work, perimeter controls such as silt fence, inlet protection, construction entrances, stabilization of disturbed areas, inspection duties and how the site will be permanently stabilized at the end.

When you need a licensed Professional Engineer

  • Many states and localities require erosion control plans and SWPPPs for larger sites to be prepared or certified by a licensed engineer or a certified erosion control professional.
  • Sites near streams, wetlands or impaired waters often face stricter requirements and extra review.

Engineers can only seal work in states where they are licensed. Check a PE license by state →

Typical scope of work

  • Check which state and local permits apply to your site.
  • Phased erosion and sediment control plan tied to the grading plan.
  • Details for silt fence, inlet protection, construction entrance, sediment traps or basins.
  • Stabilization and seeding plan, including final stabilization.
  • SWPPP document and permit application (Notice of Intent), where required.
  • Inspection and maintenance schedule for the contractor.

What you get

  • Sealed erosion control / EPSC plan sheets
  • SWPPP document and permit forms, where required
  • Final stabilization plan

Before you post: what to have ready

  • Site address, acreage and how much ground will be disturbed
  • Grading or site plan, if one exists
  • Nearby streams, wetlands or storm drains
  • Construction schedule and phasing
  • Any comments from the city, county or state reviewer

What affects the cost

Fees vary by location, scope and urgency, so the reliable way to price your project is to compare quotes. These are the main factors engineers price on:

  • Disturbed area and slope
  • Whether a full SWPPP and state permit coverage are needed
  • Number of construction phases
  • Sensitive waters near the site
  • Ongoing inspections during construction, if included

How it works

  1. Post the project with the site size and location.
  2. Civil engineers quote the plan and any permit documents.
  3. The engineer prepares the plan, usually alongside the grading plan.
  4. Plans are submitted for review; controls are installed before work starts.

Frequently asked questions

What is the difference between an EPSC plan and a SWPPP?

An EPSC or erosion control plan is the set of drawings showing the controls. A SWPPP is a broader document required under the stormwater construction permit, and it includes the erosion control plan plus inspection, maintenance and record-keeping procedures.

Do I need a plan for a small site?

Possibly. Sites under one acre may not need state permit coverage, but many cities and counties still require erosion control measures or a plan with a grading or building permit.

Who inspects the controls during construction?

Permits usually require regular inspections by the operator or a qualified inspector, and after significant rain. Some owners hire the engineer or a certified inspector to do these.

Open projects like this on EngineerMint

Engineers: these buyers are accepting quotations now.

EM-RFP-2026-1108-001
Status: Open

Erosion Control, Grading & EPSC Plans Needed – Tennessee (Rush)

Civil / Site

Civil engineer needed to prepare three plans for a site in Tennessee: an erosion control plan before work begins, a grading plan, and a final erosion prevention and sediment control (EPSC) / stabilization plan. The buyer asks for your fee and turnaround time for all three.

Location
Tennessee
Required equipment or services
Erosion control plan, grading plan, final EPSC / stabilization plan
Budget
Budget not stated
Dates
Posted Nov 8, 2026 · Rolling deadline · Start: ASAP / rush (within 30 days)
Quotes so far
No quotes yet
EM-RFP-2026-1103-001
Status: Open

Civil Engineer Needed – Padel Court Conversion, Cary, NC (Rush)

Civil / Site

EngineerMint is seeking a local civil engineer for a small commercial recreation project in Cary, North Carolina. The buyer is in a due-diligence period and plans to convert two existing tennis courts on an approx. 1.56-acre portion of an existing private recreation club property into three outdoor padel courts for a small commercial club. The existing slab would be reused, with shared parking and access. REQUESTED SERVICES 1. Sketch plan for a Town of Cary pre-application conference, and possibly attending that meeting with the buyer 2. Design wind speed for the site, needed by the court manufacturer for its quote 3. If the project moves forward: site/development plan, including stormwater, lighting and subdivision coordination AVAILABLE INFORMATION • The seller's existing site plan and concept plans can be shared during proposal development

Location
Cary, NC
Required equipment or services
Pre-application sketch plan, design wind speed, site/development plan (stormwater, lighting, subdivision coordination) · Qty: 3 outdoor padel courts (conversion of 2 tennis courts)
Budget
Budget not stated
Dates
Posted Nov 4, 2026 · Rolling deadline · Start: ASAP — within 30 days
Quotes so far
No quotes yet